Subject:
Delivery Time Control &
Conditions of Sales.
Dear Sir or Madam:
In order to avail the exact "Delivery time" as
set in our sales contract, we require you to check the following
points carefully and fulfill right away what are necessary
as set below.
| Your order no. |
|
Our Sales No. |
|
| Planned production |
|
Planned delivery |
|
1) Fabric booking date control:
Upon receipt of necessary fabrics, accessories and other
materials to our factory, the allotted production period is
between 25 to 55 working days. We also need you to inform
us the following details prior to production:
a) Fabric
composition / construction and treatment requirements,
b) Size
chart & Size assortment.
c) Color
combination of each style.
| BEFORE: |
|
Planned arrival Of fabric/s |
|
For fabrics availability, you can recommend your own supplier/s
or we can recommend you our usual suppliers, rest assured,
we always check and recheck the suppliers if there is delay
in the fabrics arrival. Our expected delivery date for the
output products, as pre-scheduled, might be subject for change,
depending on the availability of the fabrics, but we will
always keep you informed.
** If we often change the specifications for your approval,
then expect for another delay of the fabric lead time. Rest
assured, we always do our best to meet your expectation and
satisfaction at reasonable fabric lead time.
2) Technical instructions & Accessories information:
At first, you are kindly requested to supply us with your
technical instructions of the goods preferably in full detail
at once.
| BEFORE: |
|
Planned arrival In our factories |
|
a) It is much better, if possible, to send us the
actual samples of goods, label, logo, and others, for us to
have a clear copy prior to production, to avoid doubts and
repetitions.
b) Accessories information: You have to give
us full details with a drawing-sketch indicating the location
where those label and logo are supposed to be placed. Please,
note that vague description may lead to confusion and delay
of fabrication.
c) We assure you of constant update at the start
of production to correct right away if there is need for correction
or to move on with the production if everything is approved.
But once production is approved, any changes at the middle
of the production may or may not be catered depending on the
situation on what is/are to be changed.
d) To sum up, please take note that our factory will
not start the booking and production until we receive your
approval for production with full detail of technical specifications
and instructions on all necessary materials and accessories
such as fabrics, care label, logo, codes, buttons, zipper,
hangtag, polybag etc. All these things should be ready and
available prior to production. And once bulk production has
started on line, it will go on continuously to be done by
hundreds of workers, and it is not possible to suddenly stop
just to shift to another style. We always count on your good
understanding and support on the transaction to obtain good
business relationship with us.
3) Reminder: For more convenience, please
check all necessary labels, accessories and styles as tabulated
below.
| Specifications |
Styles |
Yes |
No |
Remarks (if supplied by you, when?) |
| Embroidery |
|
|
|
|
| Woven label |
|
|
|
|
| Hangtag |
|
|
|
|
| Ean code |
|
|
|
|
| CE sheet |
|
|
|
|
|